The Selected Company of this project, there responsibility to do follows:
Company No.1:
1.To be use two slots of parking area near B side service elevator No. 9 for keep materials and items there and to be lifting the materials and items to Shaza Diwan in 12th floor by service elevator No. 9
2.. The engineers and company team names will send to the Shaza hotel for arrange contractors cards and have access to the parking area and project area
3. to be coved the service elevator No.9 by good wooden materials and in a good shape in order to protecting the elevator from damage or scratch
4.to be build partition in the main corridor in 12th floor before service elevator No.9 till room 1208-1209 (Z) shape for avoiding disturbing our guest in 12th floor
5. To be removing the calligraphy from the main corridor 12th and carpet till the new partition as point No.4
"* Engineering Team will be responsible to protecting the main cooridor12th and stored the carpet and calligraphy till end of project in order to fixed back
* HK they will responsible on
"
6.To have signage by name of outlet located between the both entrances of Shaza Diwan.
7. The both entrance doors will remain the same with installing new doors locks as per the Shaza required
8.Both entrance will have marble flooring, painted walls gibson and board ceiling spots light GU5.3, calligraphy’s as per requirements.
9.The F&B back area will be located on the right side after the entrance full walls & flooring tiles, forceilling applicable for the service area, main wooden door and lock, and to be equipped by under counter Dishwasher dishwasher with basin, S.S tables & coppered, stand fridge and hot cabinet.
10. Gents bathroom will be located right side after the back area, equipped by two hand wash basin, one toilet; ventilation will be connecting with the guest room ventilation EX fan toilets design similar to the (banquet toilets design)
11. Ladies bathroom will be located lift side after the entrance, equipped by two hand wash basin, one toilet; ventilation will be connecting with the guest room ventilation EX fan toilets design similar to the (banquet toilets design)
12. buffet area will be located in the medial of outlet as per the shop drawing attached, design similar to Silk lounge buffet station
13.Tthe outlet windows will be covered by curtains as per Shaza design match with furniture colors.
14. the outlet ceiling will be covered by Gipson boards water proof type and spot light GU5.3 LED type, flooring will be covered by marbles 60*60cm similar to the arabesque flooring, walls wall be covered by painting,
15.The outlet will be covered be firefighting system, fire alarm system, public address system
16. A/C will be FCU machine connecting with the our chilled water system
17. Outlet tables and chairs quantity will provide by D.F&B
18. Hot buffet will be equipped by built in induction similar to Silk lounge , cold & desert buffet will be equipped by cooling built in system with all necessary requirement sneeze guards
النتائج (
العربية) 3:
[نسخ]نسخ!
The Selected Company of this project, there responsibility to do follows:Company No:1.To be use of two slots parking area near ب side service elevator No. 9 for تبقى materials and items there and to be lifting the materials and items to Shaza الديوان in 12th floor by service elevator No. 92..............The engineers and company team names will send to the hotel. Shaza cards for and have access to the contractors parking area and project area3 -to be coved the service elevator No.9 by good 1 materials and in a good shape in order to protecting the elevator from damage or الصفر4.to be بناء partition in the main corridor in 12th floor before service elevator No.9 حتى غرفة 1208-1209 (ض) شكل for avoiding ولكن الضيف 12 floor in our5 -To be removing the calligraphy from the main corridor carpet / 12 and the new partition as نقطة رقم 4"* Engineering Team will be responsible to protecting the main cooridor12th and the carpet and calligraphy stored / end of project in order to ثابت back* هونج كونج they will responsible on"6.To have signage by name of لياندرو located between the both entrances of Shaza الديوان.7 -The both entrance will remain the same with installing الأبواب أقفال as per the new الأبواب Shaza required8.Both entrance will have marble flooring، painted الجدران جيبسون and المجلس سقف spots light GU5.3، calligraphy 's as per requirements.9.The ب back area will be located on the right side after the entrance full الجدران & flooring البلاط، forceilling applicable for the service area, door and main 1 قفل, and to be equipped by under counter Dishwasher dishwasher with basin, S.S tables & coppered يقف مجلس الوزراء fridge and hot.10 -جدعون الحمام will be located right side after the back by two اليد area, equipped wash basin, one المرحاض; Mexican will be connecting with the Mexican EX مروحة غرفة الضيف toilets design similar to the (مأدبة toilets design)11 -السيدات الحمام will be located lift side after the entrance، equipped by two اليد غسل basin, one المرحاض; Mexican will be connecting with the Mexican EX مروحة غرفة الضيف toilets design similar to the (مأدبة toilets design)12 -الإفطار area will be located in the هو لياندرو as per the shop of drawing attached, design similar to الحرير صالة الإفطار station13.Tthe لياندرو ويندوز will be covered by ام as per Shaza design match with furniture الألوان.14 -the لياندرو ceiling will be covered by Gipson boards water proof type and بقعة ضوء الصمام GU5.3 type flooring will be covered by marbles 60 * 60 سم similar to the arabesque flooring الجدار be covered by اللوحة، الجدران،15.The لياندرو will be covered be firefighting system, fire أليكس system, public address system16 -A / C will be المتاخم آلة connecting with the our chilled water system17 -منفذ tables and chairs quantity will provide by D.F&B18 -الساخنة الإفطار will be equipped by built in الاستقراء similar to الحرير صالة، الباردة & desert الإفطار will be built in by وقد equipped with all necessary requirement sneeze guards system